A GNSS stakeout workflow from design to as-built check
Reliable stakeout begins with the design reference and ends with a recorded check of the placed point.
Prepare the design before going to the point
Check the design revision, point identifiers, coordinate system, height type and units before importing a layout file. Test a known control point with the active receiver setup. A correct RTK solution cannot identify that the operator imported an older drawing or selected a point from the wrong project.
Continue learning Coordinate reference systems and datums for GNSS surveys
Close the loop after placement
Approach the point using suitable guidance, review the required residuals and confirm the intended mark. Record what was actually placed rather than only saving the design coordinates. For important work, use the project independent-check method so the same mistake is not repeated in both layout and verification.
Continue learning Grid vs ground distances: avoiding a layout mismatch
Practical checklist
- Validate the design file and active receiver setup.
- Record the actual placed-point observations.
- Apply the project independent-check procedure.